Finishing the Inside, drywall, paint, hand doors, trim window openings, etc
Built a temporary floor to drywall & finish the stair well ceiling and upper walls
Early one afternoon: partitions studded in, new load of drywall onsite
later on that day:
installed the Ext. jambs and sill in the office windows
I painted the store room walls and floor,
I built a shelving unit in the store room. one shelf is at counter top height for use as a reloading bench
I added Oak rub rails to the melamine shelves then sanded and varnished the 2x4's Quick removable hold down for the press added also
I moved a ton of stuff onto the shelving unit, to make room to finish other areas of the shop.
I moved the furnishings back from the finishing room